Monday, March 2, 2009

Project Delivered




Foyer/Upstairs Sitting Area


Formal Dining


Dining Area


Library




House at Night

Actually at 11:00 am with a heavy storm cloud overcast.

Library Built-Out


Friday Morning Production Meeting

A nice muffin breakfast at the center of the table.

Max Wiese

Max building the exterior railing system.



Paul the Electrician


Dining Room


Exterior Complete







Great Room Mantle




The Kitchen







Master Bathroom











Arno Excavating


Deck Details

Tucker installing hidden fastener system with paper splines for condensation.





Wetlands Bridge

Who better to build a wetlands bridge than a naturalist?









Curved Railing

Tucker Windover Inc.










Kitchen Cabinetry

Installation chaos.


Prep and Prime

Exterior finishing.


Walnut Floor Inlay