Saturday, February 21, 2009
Mudroom Cubbies
Sean built the carcasses of the mudroom cubbies.
Friday, February 20, 2009
Marble and Stone
Hall
bathroom basket weave tile.
Valter instaling crema marfil in the shower
Interior Details
Tucker installing one of the bathroom vanities.
Tile and Stone
Lamas Tile
Tree Move
The tree did not move far, but it was put in a better location for view and added more room for the stone wall and driveway.
Hardwood Floor Delivery
Start of Interior Trim
The Great Room workshop.
Trim Delivery
Copper Roof Library
Blueboard
The Basement stairs (top) and the kitchen (bottom).
Siding/Exterior Details
I think the house begins to look a lot more livable.
Garage Details
Sean and Tom work on the dormers while Willerson sides.
Closed Cell Sray Foam Insulation
This insulation makes the house a lot more efficient.
Siding
The library's exterior.
Rough interiors
Kitchen arch.
Front Exterior Elevations
Start of exterior trim.
Interior Partitions
Basement game room and theater.
Pacewicz Electric
Jim and Leonardo
Custom Climates
Scott Zona
The Grand Staircase
Roof
Certainteed slate.
Blue Protection
Hold on!! Don't let the wind blow you away
Roof Frame Finished
January 20th- the exterior frame is complete
The Plumber
Dan and Dan (Jason Biggs)
Winter Wonderland
I hope you brought your snow shovel, and just in the backyard, some deer admire the house.
Fireplace
Chris building main fireplace.
Boomer
Rooftop deliveries.
2nd Floor Longview
Tucker cutting and sheathing.
Finshed Concrete Floors
Professor Tom
Senior lead Tom Cochrane shows Willerson a thing or two about the layout.
Lifting Walls
-"Who has the nail gun?"
-"Nailgun?"
Stairways/Stairwells
Cold and Clean
A clean job site is a happy job site.
2nd Floor Deck
End of week two.
First Aid
With just a frame up, it is most likely cold enough that Sheldon cannot feel his nail wound.
Sean Moriarty
Sean Moriarty is a lead carpenter who is working with the steel support beam in what will be the basement.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Our Website
www.wiese.com
Back to Home Blog
Go back to Wiese Projects Blog
Followers
Blog Archive
▼
2009
(71)
►
April
(1)
►
March
(22)
▼
February
(48)
Mudroom Cubbies
Marble and Stone
No title
Interior Details
Tile and Stone
Tree Move
Hardwood Floor Delivery
Start of Interior Trim
Copper Roof Library
Blueboard
Siding/Exterior Details
Garage Details
Closed Cell Sray Foam Insulation
Siding
Rough interiors
Front Exterior Elevations
Interior Partitions
Pacewicz Electric
Custom Climates
The Grand Staircase
Roof
Blue Protection
Roof Frame Finished
The Plumber
Winter Wonderland
Fireplace
Boomer
2nd Floor Longview
Finshed Concrete Floors
Professor Tom
Lifting Walls
Stairways/Stairwells
Cold and Clean
2nd Floor Deck
First Aid
Sean Moriarty
Great Room Framing
Keeping Warm at Lunch
Framing and Steel for the 1st Floor
Design Team
Wiese Company Framing
More Concrete Work
Concrete Pouring Time
Footings Complete
Al Bain
For Sale
Excavation Preparation
Ground Breaking Day
About Me
The Wiese Company
View my complete profile