Thursday, April 2, 2009
While you were out
Prepping for stone walls and a circular drive
Monday, March 2, 2009
Project Delivered
Foyer/Upstairs Sitting Area
Formal Dining
Dining Area
Library
House at Night
Actually at 11:00 am
with
a
heavy
storm cloud overcast.
Library Built-Out
Friday Morning Production Meeting
A nice muffin breakfast at the center of the table.
Max Wiese
Max building the exterior railing system.
Paul the Electrician
Dining Room
Exterior Complete
Great Room Mantle
The Kitchen
Master Bathroom
Arno Excavating
Deck Details
Tucker installing
hidden
fastener
system with paper splines for condensation.
Wetlands Bridge
Who better to build a wetlands bridge than a
naturalist
?
Curved Railing
Tucker Windover Inc.
Kitchen Cabinetry
Installation chaos.
Prep and Prime
Exterior finishing.
Walnut Floor Inlay
Saturday, February 21, 2009
Mudroom Cubbies
Sean built the carcasses of the mudroom cubbies.
Friday, February 20, 2009
Marble and Stone
Hall
bathroom basket weave tile.
Valter instaling crema marfil in the shower
Interior Details
Tucker installing one of the bathroom vanities.
Tile and Stone
Lamas Tile
Tree Move
The tree did not move far, but it was put in a better location for view and added more room for the stone wall and driveway.
Hardwood Floor Delivery
Older Posts
Home
Subscribe to:
Posts (Atom)
Our Website
www.wiese.com
Back to Home Blog
Go back to Wiese Projects Blog
Followers
Blog Archive
▼
2009
(71)
▼
April
(1)
While you were out
►
March
(22)
►
February
(48)
About Me
The Wiese Company
View my complete profile